Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered by Vesgantti

Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered

$1,154.98
Sale price  $1,154.98 Regular price 

Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered

$1,154.98
Sale price  $1,154.98 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 109" U Shaped Cloud Sectional Sofa is a Sofas & Couches product. It features spacious and comfortable seating: our 109 inch large u-shaped couch.

Key Features

  • Spacious and comfortable Seating: Our 109 inch large U-shaped couch features 28.7 inch deep seating area and 24 inch ottoman, creating large ample space for your and your family rest needs. This cloud sofa is designed with a double-layered high-resilience foam seat, 3 thick cushions, and 2 armrests, providing ergonomic support for your waist and back. The extremely soft double-layered seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
  • Premium Corduroy Fabric: The modular sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your sectional sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
  • Convertible Modular Sectional Sofa: This cloud sofa features a movable ottoman for flexible switching that you create an left facing or right facing L-shaped sofa, or comfortable U-shaped sectional. The versatile couch with chaise allows you to customize the layout to suit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
  • Easy Assembly and Disassembly: This 109'' U-shaped sofa will be delivered in 2 boxes and easily carried. Before assembly, please check all parts. You can complete the installation in 30 minutes by following the included detailed instructions. The modular sectional couch is also easy to disassemblec and carry if you would move to a new place. Note: The cushions, backrest, and pillows are vacuum-packed. After unpacking, please fluff them thoroughly, it may take 24-48 hours for fully expand
  • Stable Structure and Reliable Customer Service: The frames (armrests, backrests, seat frames) of sectional couches are made of FSC-certified wood, making them more stable, durable, and load-bearing than other products. Secure screw-on connections keep each piece firmly in place, ensuring stability while making them suitable for a variety of body types. If you are not satisfied with the sofa you received, please feel free to contact our customer service team for satisfactory customer service

Why Choose the Vesgantti 109" U Shaped Cloud Sectional Sofa

The Vesgantti 109" U Shaped Cloud Sectional Sofa offers spacious and comfortable seating: our 109 inch large and premium corduroy fabric: the modular sofa is upholstered. These features make the Vesgantti 109" U Shaped Cloud Sectional Sofa a strong option in the Sofas & Couches category.

Best For

The Vesgantti 109" U Shaped Cloud Sectional Sofa is best suited for: Cloud Sectional, a variety of body types.

Quick Summary

The Vesgantti 109" U Shaped Cloud Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Weight Limit: 1250 Pounds. Product Dimensions: 55.5"D x 109"W x 33"H. Item Weight: 97.89 Pounds. Price: $1154.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Weight Limit 1250 Pounds
Product Dimensions 55.5"D x 109"W x 33"H
Item Weight 97.89 Pounds
Type Sectional
Color Beige
Special Feature Cloud Sectional
Room Type Bedroom, Living Room
Arm Style Pillow-Top
Seating Capacity 5.00 Style Modern
Shape Rectangular Frame Material Wood
Vesgantti 109" U Shaped Cloud Sectional Sofa, Comfy Corduroy Upholstered by Vesgantti

Pairs well with