Vesgantti 40" Single Seat Sofa, Comfy Cloud Couch Deep Seat Upholstered Couch by Vesgantti

Vesgantti 40" Single Seat Sofa, Comfy Cloud Couch Deep Seat Upholstered Couch

$589.36
Sale price  $589.36 Regular price 

Vesgantti 40" Single Seat Sofa, Comfy Cloud Couch Deep Seat Upholstered Couch

$589.36
Sale price  $589.36 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti 40" Single Seat Sofa is a Sofas & Couches product. It features cloud couch delivers cloud-like comfort: enjoy the generous 26-inch seat.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth—significantly deeper than others. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. The adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: The overall size of this single modular sofa is 30"D x 40"W x 35.5"H, perfect on its own or in combination with Vesgantti modular sofas! You can customize your seating arrangement to suit your space and lifestyle. Its rearrangeable components make it effortless to refresh the look of your living room. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this modular couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This sectional couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This single couch will be delivered in 1 box, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 40" Single Seat Sofa

The Vesgantti 40" Single Seat Sofa offers cloud couch delivers cloud-like comfort: enjoy the generous and fully modular design for customizable layouts: the overall. These features make the Vesgantti 40" Single Seat Sofa a strong option in the Sofas & Couches category.

Best For

The Vesgantti 40" Single Seat Sofa is best suited for: Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs, extended lounging sessions, all body types.

Quick Summary

The Vesgantti 40" Single Seat Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Weight Limit: 250 Pounds. Product Dimensions: 30"D x 40"W x 35.5"H. Item Weight: 56 Pounds. Price: $589.36.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Weight Limit 250 Pounds
Product Dimensions 30"D x 40"W x 35.5"H
Item Weight 56 Pounds
Type Standard
Color Chenille - Snow White
Special Feature Cloud Sectional, Extra-deep Ottoman, Pillow Top Armrest, Removable Cover, Two Sets of Legs
Room Type Bedroom, Living Room
Arm Style Pillow-Top
Seating Capacity 1.0 Style Modern
Shape Rectangular Frame Material Wood
Vesgantti 40" Single Seat Sofa, Comfy Cloud Couch Deep Seat Upholstered Couch by Vesgantti

Pairs well with