Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses by Vesgantti

Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses

$362.98
Sale price  $362.98 Regular price 

Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses

$362.98
Sale price  $362.98 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is a Mattresses product. It features 【posh hybrid design】certipur-us certified memory foam and 7-zone pocketed innerspring.

Key Features

  • 【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers
  • 【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night
  • 【Breathable Mattress】Vesgantti full mattress designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment
  • 【Sleep Well】Vesgantti Hybrid Mattress offers a medium firm plush feel, Satisfies most people's sleep preferences, You can enjoy a comfortable sleep every night with the purchase of our mattresses
  • 【Mattress In a Box】The mattress arrives compressed and rolled in a box for easy delivery and setup. Simply unbox, unroll, and let it expand to its full size within a few hours, but please allow 24-72 hours for it to fully expand

Why Choose the Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size

The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size offers 【posh hybrid design】certipur-us certified memory foam and 7-zone and 【ultra quiet】the innerspring work independently of each other. These features make the Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size a strong option in the Mattresses category.

Best For

The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is best suited for: Breathable.

Quick Summary

The Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses - Ergonomic Design with Memory Foam and Pocket Spring Mattress Full Size is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: Full. Product Dimensions: 75"L x 54"W x 10"Th. Top Style: Euro Top. Cover Material: Polyester. Price: $362.98.

Product Specifications

Specification Details
Brand Vesgantti
Size Full
Product Dimensions 75"L x 54"W x 10"Th
Top Style Euro Top
Cover Material Polyester
Number of Layers 8
Fill Material Memory Foam
Special Feature Breathable
Color White
Coil Type Pocketed Coil
Item Weight 65 Pounds Item Firmness Description Medium Firm
Vesgantti Full Mattress 10 Inch Innerspring Multilayer Hybrid Full Mattresses by Vesgantti

Pairs well with