Vesgantti King Size Mattress, 12 Inch Hybrid Innerspring Mattress in a Box by Vesgantti

Vesgantti King Size Mattress, 12 Inch Hybrid Innerspring Mattress in a Box

$329.98
Sale price  $329.98 Regular price 

Vesgantti King Size Mattress, 12 Inch Hybrid Innerspring Mattress in a Box

$329.98
Sale price  $329.98 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti King Size Mattress is a Mattresses product. It features support and comfort: the king size mattress features individually wrapped.

Key Features

  • Support and Comfort: The king size mattress features individually wrapped pocket coils and pressure-relieving foam, which work together to provide targeted support, cradle your body shape and ease the aches and pains, so you awake feeling refreshed. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Cooling and Breathable: The cooling gel particles and air-flow between coils make the foam ventilated, expel steamy sweat, maintain a comfortable sleep environment all night
  • Isolated Motion: The individually pocket spring allow it to absorb movement from your partner, you sleep deeply and soundly never be disturbed all night
  • Healthy and Skin-Friendly: Made of foam approved by CertiPUR-US, non fiberglass, non toxic, hypoallergenic, Vesgantti mattress is an affordable and optimal option for your family
  • King Mattress in a Box: Vacuum Packed in a box, smaller size, easy to carry. We recommend allowing 72 hours for the mattress to be fully expanded. If you have any issues, please let us know without hesitation

Why Choose the Vesgantti King Size Mattress

The Vesgantti King Size Mattress offers support and comfort: the king size mattress features and cooling and breathable: the cooling gel particles and. These features make the Vesgantti King Size Mattress a strong option in the Mattresses category.

Best For

The Vesgantti King Size Mattress is best suited for: Breathable, Hypoallergenic, Low Motion Transfer, Orthopedic, Pressure Relief.

Quick Summary

The Vesgantti King Size Mattress is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: King. Product Dimensions: 80"L x 76"W x 12"Th. Top Style: Tight Top. Cover Material: Polyester Blend. Price: $329.98.

Product Specifications

Specification Details
Brand Vesgantti
Size King
Product Dimensions 80"L x 76"W x 12"Th
Top Style Tight Top
Cover Material Polyester Blend
Number of Layers 5
Fill Material Spring and Foam
Weight Limit 200 Pounds
Special Feature Breathable, Hypoallergenic, Low Motion Transfer, Orthopedic, Pressure Relief
Color Blue and White
Item Weight 100 Pounds Item Firmness Description Medium Firm
Vesgantti King Size Mattress, 12 Inch Hybrid Innerspring Mattress in a Box by Vesgantti

Pairs well with