Vesgantti Twin Mattress, 12 Inch Hybrid Twin Size Mattress in a Box, Single Bed by Vesgantti

Vesgantti Twin Mattress, 12 Inch Hybrid Twin Size Mattress in a Box, Single Bed

$360.51
Sale price  $360.51 Regular price 

Vesgantti Twin Mattress, 12 Inch Hybrid Twin Size Mattress in a Box, Single Bed

$360.51
Sale price  $360.51 Regular price 
Shipping calculated at checkout.

Product Overview

The Vesgantti Twin Mattress is a Mattresses product. It features 【medium-firm plush feel】- fully expanded 75*53*12 inch(lwh) approx. vesgantti luxury.

Key Features

  • 【Medium-Firm Plush Feel】- Fully expanded 75*53*12 inch(LWH) approx. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
  • 【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
  • 【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
  • 【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
  • 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)

Why Choose the Vesgantti Twin Mattress

The Vesgantti Twin Mattress offers 【medium-firm plush feel】- fully expanded 75*53*12 inch(lwh) approx. and 【individual pocket spring】- innovative zoned support system constructed. These features make the Vesgantti Twin Mattress a strong option in the Mattresses category.

Best For

The Vesgantti Twin Mattress is best suited for: Breathable.

Quick Summary

The Vesgantti Twin Mattress is a Mattresses product by Vesgantti. Brand: Vesgantti. Size: Twin. Product Dimensions: 75"L x 39"W x 12"Th. Top Style: Pillow Top. Cover Material: Polyester. Price: $360.51.

Product Specifications

Specification Details
Brand Vesgantti
Size Twin
Product Dimensions 75"L x 39"W x 12"Th
Top Style Pillow Top
Cover Material Polyester
Number of Layers 8
Fill Material High Density Foam
Special Feature Breathable
Color White
Coil Type Pocketed Coil
Item Weight 54.01 Pounds Item Firmness Description Medium Firm
Vesgantti Twin Mattress, 12 Inch Hybrid Twin Size Mattress in a Box, Single Bed by Vesgantti

Pairs well with